Partnering with Irrigated Agriculture for
Innovative Water Management Solutions
The Water Hauler's Bulletin - Structures
Title
Year
646 Flexible Concrete
1991
ABC Bridges
1986
ArmorThane Coat - Structures
1995
Automated Overshot Gate
1990
Automatic Check Gate
1984
Backfilling Precast Structures
1982
Calibration of Hydraulic Structures
1982
Chains and Lifting Devices
1984
Chute Drop Repair - Sika Top Mortar - BRID
1981
Concrete Weirs
1996
Consolidated Concrete Pipe - Pressure Tested
1984
Consolidated Concrete's New Precast Panel
1981
Consolidated Erection Anchor for Lifting
1985
Crack Repairs in Concrete Structures
1992
Diagonal Weir on SMRID's North Burdett Main Canal
1999
Fabriform Chute ‑ Imperial Spillway
1981
Fibriform Chute
1984
Fibriform Chute - 10 year Update
1990
Fibriform Chutes
1987
Flax ‑ Straw and Rock Drops
1988
Freezing Temperatures Mean Broken Air Values
1989
Gate Stem Covers
1994
Heritage Fund Logo
1984
Langemann Constant Flow Gate
1993
Langemann Gate being Marketed
1995
Level Control with the Langemann Gate
1997
Lifting Precast Panels
1982
New GST Revetments - Bullshead Spillway
Vol. 38
1990
New GST Revetments - Bullshead Spillway
Vol. 43
1991
New Level Control for Small Laterals
1992
Overshot Gate Discharge Characteristics
1990
Pipeline Turnout Baffle Box
2000
Precast Chute Drops
1983
Precast Pipe Inlet
2009
Precast Structures
1991
Precon Expands Irrigation Products
1985
Precon Structures
1983
Precon's New Turnout
1986
Rehabilitation of Check Structures
1998
Rehabilitation with Sika Top
1984
Retrofit of Undershot Gate to a Undershot Structure
1990
Rock Gabions
1988
Scissors Clamp - Lifting PVC Pipe
1986
Solar Panel in LNID
1994
Stafford Automatic Control System
1982
Structure Drainage
1990
The Pro Controller
2000
Unique Box Culvert
1989
Unique BRID Pipe Inlet Structure
2010
Unmanned Grade Control
1990
Weston Baffle Outlet Structure
1980